48-hour rebuild. Ranking infrastructure installed. 40 to 80 pages.
The entry-point tier. 40 to 80 pages rebuilt in Next.js 16, full SEO foundation, real content elevated from your existing site. Ideal when you outgrew WordPress and need a production site without a 3-month engagement.
Investment
$12K-$18K
one-time + $1,500/month retainer
Timeline
14 to 21 days
Ideal for
B2B service firms, medical groups, specialty trades, $10M to $30M revenue.
One-time build
What you get at launch.
Monthly retainer
$1,500/month. Begins 30 days post-launch.
Why this tier fits who it fits.
- 01You've outgrown WordPress or Squarespace. The site works, but it's slow, unranked, and hard to update. Every agency quote is 12 weeks and $60K.
- 02You don't need 1,000 pages yet. You need the 50 pages you have to actually load fast, rank properly, and look like the business you're running.
- 03You value owning your code. Platform lock-in (Webflow, Wix, Squarespace) is a tax on every future decision. Foundry hands you a private GitHub repo at launch.
- 04You want ongoing content but not a 5-person agency relationship. The $1,500/month retainer ships 8 posts a month with Lighthouse + GA4 + Search Console reporting. Bigger scope upgrades to Atlas.
How the engagement runs.
- Step 1
Deposit
50% on signature, via Stripe Invoice. Work starts the day the deposit clears. No scoping call needed, the SOW is signed with the deposit.
- Step 2
Recon
Days 1-2. We crawl your current site, extract content, document brand, analyze what's working. You don't need to send assets or write anything.
- Step 3
Brand + architecture
Days 3-4. We write the build spec: pages, URL structure, SEO plan, design direction. Sent to you for sign-off if you want it, or trusted if not.
- Step 4
Build
Days 5-14. Head-down build. You get one status update on day 7. Preview URL shared on day 10 with a 30-minute review call.
- Step 5
Revisions + audit
Days 11-17. Feedback incorporated. Visual audit run to 9.5/10+. Lighthouse, accessibility, SEO all verified green.
- Step 6
Launch
Days 18-21. DNS cuts over. Site live at your domain. Private GitHub repo transferred to your org. Retainer kickoff scheduled for day 30.